Difference between revisions of "Productivity Reports"
From Datonis
(Created page with " Different Reports covered under this are as follows: *# Cell/Line Analysis: This is a modified version of the Daily Production insight from the Datonis Factory application...") |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Different Reports covered under this are as follows: | + | Productivity is an important workspace in Datonis Manufacturing Intelligence. Different Reports covered under this are as follows: |
*# Cell/Line Analysis: This is a modified version of the Daily Production insight from the Datonis Factory application. For the Cell/Line selected this shows all the indicators covering the Performance measures of the Cell. This data is been shown for the selected date. Under the Highlights section, this mainly covers the OEE, Availability, Performance, Quality. This also covers the other productivity related elements like Total Production, Total Down Time, Up Time and Capacity Utilization. Other than the Highlights section there is also a Work center Details section which shows the above information of each work center in a tabular view. With the introduction of the concept of Line in Datonis Manufacturing Intelligence we have introduced the Line level report as well under this section. The Line report shows the performance of each work center covering the productivity aspects of the Line for the selected date. There is also a link provided for the further drill down view of this at Work center level. | *# Cell/Line Analysis: This is a modified version of the Daily Production insight from the Datonis Factory application. For the Cell/Line selected this shows all the indicators covering the Performance measures of the Cell. This data is been shown for the selected date. Under the Highlights section, this mainly covers the OEE, Availability, Performance, Quality. This also covers the other productivity related elements like Total Production, Total Down Time, Up Time and Capacity Utilization. Other than the Highlights section there is also a Work center Details section which shows the above information of each work center in a tabular view. With the introduction of the concept of Line in Datonis Manufacturing Intelligence we have introduced the Line level report as well under this section. The Line report shows the performance of each work center covering the productivity aspects of the Line for the selected date. There is also a link provided for the further drill down view of this at Work center level. | ||
*# Work center Analysis is the report capturing the productivity elements at the work center. This is same as the report covered under the section IV above. In the Datonis Factory there was a link to book the reason codes (Down time) from this report. Since we have added the enhanced version of the booking part under the Actions menu, user will not be able to book the reason code from this page in Datonis Datonis Manufacturing Intelligence. | *# Work center Analysis is the report capturing the productivity elements at the work center. This is same as the report covered under the section IV above. In the Datonis Factory there was a link to book the reason codes (Down time) from this report. Since we have added the enhanced version of the booking part under the Actions menu, user will not be able to book the reason code from this page in Datonis Datonis Manufacturing Intelligence. | ||
Line 6: | Line 6: | ||
Following video shows a demo of these reports. | Following video shows a demo of these reports. | ||
+ | |||
+ | {{#ev:youtube|https://youtu.be/3Oq0gM4By30}} |
Latest revision as of 11:48, 9 April 2018
Productivity is an important workspace in Datonis Manufacturing Intelligence. Different Reports covered under this are as follows:
- Cell/Line Analysis: This is a modified version of the Daily Production insight from the Datonis Factory application. For the Cell/Line selected this shows all the indicators covering the Performance measures of the Cell. This data is been shown for the selected date. Under the Highlights section, this mainly covers the OEE, Availability, Performance, Quality. This also covers the other productivity related elements like Total Production, Total Down Time, Up Time and Capacity Utilization. Other than the Highlights section there is also a Work center Details section which shows the above information of each work center in a tabular view. With the introduction of the concept of Line in Datonis Manufacturing Intelligence we have introduced the Line level report as well under this section. The Line report shows the performance of each work center covering the productivity aspects of the Line for the selected date. There is also a link provided for the further drill down view of this at Work center level.
- Work center Analysis is the report capturing the productivity elements at the work center. This is same as the report covered under the section IV above. In the Datonis Factory there was a link to book the reason codes (Down time) from this report. Since we have added the enhanced version of the booking part under the Actions menu, user will not be able to book the reason code from this page in Datonis Datonis Manufacturing Intelligence.
- Loss Analysis : This report is similar to the report built in Datonis Factory. There is no change in this report in Datonis Manufacturing Intelligence.
- Comparative Analysis: Comparative Analysis allows the user to compare the good batch vs bad batch based on the rejection booked. This also enabled to correlated the condition based monitoring of the CBM parameters in case of the selected good or bad batch. This report is similar to the report built in Datonis Factory. There is no change in this report in Datonis Manufacturing Intelligence.
Following video shows a demo of these reports.