Column Name
|
Description
|
machine_key
|
Unique ID for the Workcenter
|
shift_key
|
Unique ID for the Shift
|
working_day
|
Day for which the shifts are planned
|
license_key
|
Unique ID for the account
|
machine_name
|
Workcenter Name in MInt
|
cell_line_name
|
Cell/ Line Name in MInt
|
dept_name
|
Department Name in MInt
|
plant_name
|
Plant Name in MInt
|
is_primary
|
-
|
shift_name
|
Shift Name in MInt
|
cycles
|
Number of strokes of the machine
|
production_quantity
|
Cycles * Parts per cycle
|
actual_production_time
|
The time required to produce X parts in given time T
|
available_time
|
Maximum time available for production
|
downtime
|
Total time for which the machine was idle
|
unplanned_downtime
|
Time during which the machine had an Unplanned downtime reason booking
|
planned_downtime
|
Time during which the machine had a Planned downtime booking
|
expected_production_time
|
Standard/ Target Time required to produce X parts in given time T
|
idle_slot_count
|
The count of total idle slots
|
major_stoppages
|
The count of downtimes for major stoppages (threshold defined in MInt Workcenter Configuration)
|
minor_stoppages
|
The count of downtimes for minor stoppages (threshold defined in MInt Workcenter Configuration)
|
rejection_quantity
|
Total Rejected Part Quantity
|
availability
|
Availability metric for OEE Calculation
|
performance
|
Performance metric for OEE Calculation
|
quality
|
Quality metric for OEE Calculation
|
capacity_utilization
|
The metric to identify planned downtimes
|
oee
|
Overall Equipment Effectiveness (A * P * Q)
|
teep
|
Total Effective Equipment Performance (OEE * CU)
|
compressed_air
|
Utilities Air Compression Details
|
electricity
|
Utilities Electricity Details
|
steam
|
Utilities Steam Details
|
gas
|
Utilities Gas Details
|
Column Name
|
Description
|
machine_key
|
Unique ID for the Workcenter
|
shift_key
|
Unique ID for the Shift
|
working_day
|
Day for which the shifts are planned
|
reason_key
|
Unique ID for the downtime reason
|
license_key
|
Unique ID for the account
|
machine_name
|
Workcenter Name in MInt
|
cell_line_name
|
Cell/ Line Name in MInt
|
dept_name
|
Department Name in MInt
|
plant_name
|
Plant Name in MInt
|
shift_name
|
Shift Name in MInt
|
duration
|
Machine Downtime duration in seconds
|
idle_slot_count
|
The count of total idle slots
|
name
|
Downtime Reason Name
|
code
|
Downtime Reason Code
|
category_key
|
Unique ID for Downtime Category
|
category_code
|
Downtime Category Code
|
category_name
|
Downtime Category Name
|
is_reason
|
If Downtime Reason is a reason
|
is_planned
|
If Downtime Reason is a Planned reason
|
key
|
Unique ID for Downtime Reason
|
Column Name
|
Column Description
|
machine_key
|
Unique ID for the Workcenter
|
shift_key
|
Unique ID for the Shift
|
part_key
|
Unique ID for the Part/ SKU
|
routing_key
|
Unique ID for the Operation
|
working_day
|
Day for which the shifts are planned
|
reason_key
|
Unique ID for the Downtime Reason
|
machine_name
|
Workcenter Name in MInt
|
cell_line_name
|
Cell/ Line Name in MInt
|
dept_name
|
Department Name in MInt
|
plant_name
|
Plant Name in MInt
|
shift_name
|
Shift Name in MInt
|
part_name
|
Part Name
|
routing_name
|
Operation Name
|
duration
|
Machine Downtime duration in seconds
|
idle_slot_count
|
The count of total idle slots
|
name
|
Downtime Reason Name
|
code
|
Downtime Reason Code
|
category_key
|
Unique ID for Downtime Reason Code
|
category_code
|
Downtime Category Code
|
category_name
|
Downtime Category Name
|
is_reason
|
If Downtime Reason is a reason
|
is_planned
|
If Downtime Reason is a Planned reason
|
Column Name
|
Column Description
|
machine_key
|
Unique ID for the Workcenter
|
shift_key
|
Unique ID for the Shift
|
part_key
|
Unique ID for the Part/ SKU
|
routing_key
|
Unique ID for the Operation
|
working_day
|
Day for which the shifts are planned
|
machine_name
|
Workcenter Name in MInt
|
cell_line_name
|
Cell/ Line Name in MInt
|
dept_name
|
Department Name in MInt
|
plant_name
|
Plant Name in MInt
|
shift_name
|
Shift Name in MInt
|
part_name
|
Part Name
|
routing_name
|
Operation Name
|
parts_per_cycle
|
The quantity of parts produced in one cycle of the machine
|
cycles
|
Number of strokes of the machine
|
production_quantity
|
Cycles * Parts per cycle
|
acutal_production_time
|
The time required to produce X parts in given time T
|
available_time
|
Maximum time available for production
|
downtime
|
Total time for which the machine was idle
|
unplanned_downtime
|
Time during which the machine had an Unplanned downtime reason booking
|
planned_downtime
|
Time during which the machine had a Planned downtime booking
|
expected_production_time
|
Standard/ Target Time required to produce X parts in given time T
|
standard_cycle_time
|
The standard time required to produce one Part (only machine working time)
|
standard_loading_time
|
The standard time required to load one Part
|
standard_unloading_time
|
The standard time required to unload one Part
|
standard_autocycle_time
|
This is the addition of Standard Cycle Time, Standard Loading Time and Standard Unloading Time.
|
actual_cycle_time
|
The actual time required to produce one Part (only machine working time)
|
actual_loading_time
|
The standard time required to load one Part
|
actual_unloading_time
|
The standard time required to unload one Part
|
actual_autocycle_time
|
This is the addition of Actual Cycle Time, Actual Loading Time and Actual Unloading Time.
|
compressed_air
|
Utilities Air Compression Details
|
electricity
|
Utilities Electricity Details
|
steam
|
Utilities Steam Details
|
gas
|
Utilities Gas Details
|
is_last_routing
|
If an operation is the last in that particular routing, this flag will be True.
|
rejection_count
|
Count of Quality Rejections
|